Focus on Smart Vending Machine for 10 Years

One-stop Service

Provide one-stop service from product development, mold design, mold building, injection molding, assembly and delivery.

Reliable Quality

With experienced team, we strictly follow ISO quality system, the tolerances are assumed in Spec for each mould and part.

Competitive Price

Our team will analyse the customers' needs and to achieve the most satisfactory results at the most competitive and stabilize cost.

On-time Delivery

Our excellent project managers and skilled workers make sure more than 99% of our moulds can be finished and shipped on time.

3800m²
15 years
ISO9001

Products

Tool Box Mold

Tool Box Mold

Plastic Injection Mould

More

Basket Mold

Basket Mold

Plastic Moulding

More

Precision Mold

Precision Mold

Custom Plastic Mold

More

factory

3000 Square Meters Workshop

factory

CNC Machining Shop

factory

Mold Assembly Shop

factory

Injection Floor

MARKET

Over 80% moulds are exported to Europe, American etc all over the world.

FAQ
Which software do your designers use? When can I get the quotation?

We use UG for designing. Quotation will be provided in 2 working days normally.

What is the lead time for mould?

Generally speaking, for the small moulds ( below 0.6M ), we need 4-5 weeks in total; 5-7 weeks for the moulds from 0.6M to 1M while we need 7-8 weeks for the moulds that are above 1.2M.

How to ensure the mould lead time and quality?

We have a strict quality control system. It includes incoming quality check, in-process quality control, and tool buy-off quality assurance. We work closely with you from start to finish of each project. Once a week, will update the project status to customer with photos and detailed time planning.

How to confirm the sample?

We will measure sample according to customer part drawing, and submit part measure to customer in 3 days after T1. We will improve sample sink mark, flow mark, flash etc problem before send sample to customer.

What is the process if I want to put this order to you?

Well, after customer send the PO, we will send the customer the invoice, a 40% deposit payment is required this stage, we will make DFM report and discuss the technical issues with customer, and then start to do mold design. after receive the payment and customer confirm our design, we will start machining.

What is the trade term you use? Can you send the mould to my company directly?

We usually use FOB, but we can do DDU/CIF/EXW if customer needed.

Cooperation

Cooperation
×

Contact Us

captcha