Copyright 2022 Creative Innovative Co., Ltd All rights reserved. Site Map
End of Customer: NISSAN
Material: PPA
Steel: 738HH+2344
2 cavities tool with cold runner
Manufacture time: 40 days
Cycle time: 35 seconds
Mold Standard | DME/HASCO/LKM |
Color | Pantone and RAL standard |
Plastic Material | PVC/PA66/PC/PE/POM/PMMA/ABS/TPU/TPE/PE/PP |
Mold Cavity | multi-cavity/single cavity |
Mold Life | 100,000~1000,000 shots |
Mold Runner | Hot Runner/Cold Runner |
Mold Steel | P20/718/NAK80/S136/H13 |
Equipment | CNC, EDM, cutting off machine, plastic injection machine |
Certification | ISO9001:2008 |