Copyright 2022 Creative Innovative Co., Ltd All rights reserved. Site Map
Tool Box Molds
Customer: KETER Plastic Ltd (Israel)
Two cavities with two drops INCOE valve gate
Manufacture Lead Time: 45 days
Cycle Time: 26 seconds
Mold Standard | DME/HASCO/LKM |
Color | Pantone and RAL standard |
Plastic Material | PVC/PA66/PC/PE/POM/PMMA/ABS/TPU/TPE/PE/PP |
Mold Cavity | multi-cavity/single cavity |
Mold Life | 100,000~1000,000 shots |
Mold Runner | Hot Runner/Cold Runner |
Mold Steel | P20/718/NAK80/S136/H13 |
Equipment | CNC, EDM, cutting off machine, plastic injection machine |
Certification | ISO9001:2008 |